A leading countryside hotel chain commissioned the development of rapidly deployable guesthouse units to expand their room capacity. The concept was based on a modular system constructed from CLT panels, with factory-integrated service channels for mechanical, electrical, and plumbing systems.
During the design phase, we incorporated:
floor routing for hydronic underfloor heating systems
integrated cutouts for light switches, outlets, and fixtures
built-in furniture elements fabricated from CLT and embedded into the structural system
The production process also included pre-installation of interior finishes, pre-routing of MEP lines, and advance procurement of equipment and furnishings. From the start of installation to welcoming the first guests, the total timeline was just 24 days.