A leading countryside hotel chain commissioned the development of
rapidly deployable guesthouse units to expand their room capacity.
The concept was based on a modular system
constructed from
CLT panels, with
factory-integrated service channels for mechanical, electrical, and
plumbing systems.
During the design phase, we incorporated:
- floor routing for hydronic underfloor heating systems
- integrated cutouts for light switches, outlets, and fixtures
- built-in furniture elements fabricated from CLT and embedded into the structural system
The production process also included
pre-installation of interior finishes, pre-routing of MEP lines, and advance
procurement of equipment and furnishings.
From the start of installation to welcoming the first guests, the total timeline was
just 24 days.